Is It a Bug Fix or a New Feature?

By Adrian Butnaru · Independent developer · Blanes (Girona), working remotely across Spain.

Profiles: GitHub · LinkedIn.

Published: · Last technical review:

In a PHP application, a bug fix restores an agreed behaviour that has stopped working, whereas a new feature adds unforeseen capabilities, screens, or rules. My maintenance (from €60/month + VAT*) covers bug fixes; new features are quoted separately in writing.

I sign a contract with you before starting.

Criteria: compare the request with the agreement, not with its apparent size

I propose describing three things separately: what the application was supposed to do, what it does now, and what you want it to do next. You do not need to name a technical cause. A screenshot without sensitive data or a step-by-step account can help formulate the question. These examples are recommendations to prepare your inquiry, not a support requirement or an already contracted protocol.

My maintenance offering distinguishes security updates, backups, and bug fixes from new features, which I quote separately. To apply that distinction to your case, it is not enough for a request to be called an «adjustment» or «tweak». We need to identify which behaviour we are comparing and which agreement we can consult. If there is insufficient documentation, I would treat it as an open clarification, not as proof in favour of either party.

An outline to review without debating labels

Agreed behaviour
Expected operation in the written scope or that the application already performed verifiably in production.
Observed behaviour
Error, crash, or outcome different from what was agreed when running a task with the planned steps and role.
Bug fix
Intervention included in maintenance to restore agreed behaviour without altering business rules.
Addition or new feature
Creation of new screens, fields, reports, permissions, or workflows requiring deliverable definition and a separate quote.
Acceptance criteria
Concrete functional test in browser or mobile phone confirming that the bug has been fixed or the new deliverable is met.

The outline does not automatically classify the request.

I would suggest using a single operation as a common thread. For example, in a hypothetical case, «the document does not appear» needs clarification on which document, for which user, and after which action. «I want to add another type of document» poses a different need. I am not describing a real incident or anticipating its solution: I am showing how to draft two questions without taking for granted whether we are discussing a fix or an addition.

My own proof: a published separation

On my website, I state that I maintain and evolve PHP applications that are already running in your company, even if I did not build them. I also explain that deliverables, deadlines, and budgets are agreed in writing before development. Those conditions help guide the scope conversation; they do not prove the classification of a request I have not yet reviewed.

Maintenance has a starting price from €60/month + VAT*. I do not present it as an unlimited bucket of changes or as a flat fee for any fix. The published offering must be read alongside the specific need and written quote. To classify a request in your PHP tool, I review with you what it does today and what you need changed.

When you should NOT decide on intuition

I would not propose classifying work based on phrases like «it is just adding a field» or «this should not take long». Regardless of whether a change seems brief, the technical criterion is to contrast whether you seek to restore an existing behaviour or define a new one. The former requires a reference to recover; the latter requires new deliverables. Neither alternative determines a quote or a timeframe on its own.

Nor is it advisable to turn the lack of documentation into an acceptance of any interpretation. If there is insufficient reference, I would propose agreeing on what was expected and what we want to verify going forward. That does not equate to attributing an error to another developer or conceding that a feature was included. The goal is to have a shared definition before authorising work.

An incident can open another conversation

In a hypothetical example, while describing a bug you might discover that you also want a different operation. I would propose writing two separate requests: the behaviour you need restored and the capability you want assessed. The latter should not become a tacit condition of the former. The offering already distinguishes new features; keeping that distinction in the document prevents promising something that has not been quoted.

How I would approach an addition

Before proposing a solution, I would ask you to explain what new task you want to perform and who would use it. Then I would propose specifying what changes relative to existing behaviour and how you want to review it. I would not ask you to design the database or choose a technology. I would, however, propose agreeing on what outcome you need, what part is excluded from the request, and what questions remain open.

In my published process, you receive functional progress updates to test in your browser or mobile phone. For an addition, I would propose that those tests be compared against the agreed deliverables. I would not use the demonstration of a screen as automatic acceptance of any undescribed detail. Specific review and acceptance terms must be part of the scope conversation, not inferred from this article.

I also propose reviewing requests that depend on a decision from you. If a business rule, text, or sample result is missing, I would leave it flagged in the document before considering the definition closed. This is not a universal contractual methodology: it is a way to prepare a precise conversation about what you want to change and what information we need to quote it.

How to prepare your first inquiry

When preparing your inquiry, separate the description of your current PHP/MySQL application into two blocks: the bugs you need fixed within maintenance and the new features or deliverables you want quoted separately. I propose using that separation when writing: describe the current problem and, separately, the enhancement you want assessed. You can mark uncertainties without turning them into decisions. I will not take a checklist answer as acceptance of a quote or a definitive technical classification.

How to read a proposal before accepting it

I propose verifying that the description allows the request to be recognised without relying on ambiguous words like «optimise» or «improve». Is what needs to work again separated from what you want to add? Can you point out the expected outcome of each part? Is there an open question that prevents understanding it? If something is unclear, I would review it before authorising work. You do not need to evaluate a technical solution to ask for an understandable definition: the scope must allow you to identify the commission you are assessing and no other.

Hypothetical examples to distinguish fix from addition

These examples are a conversation guide, not client incidents or automatic coverage decisions. Final classification requires contrasting written behaviour against maintenance scope.

Hypothetical request Classification I would propose reviewing Reference required
An existing PDF report stops exporting accents correctly Possible bug fix within agreed maintenance Planned export and bug reproduction
Adding a date filter or an additional role to that report New feature quoted separately Filter, permissions, and outcome you want to incorporate
The report displays different data and no clear definition exists Prior clarification; I would not assign coverage automatically Expected behaviour and rules we must agree on

I would not classify the first case as included without reviewing which application and tasks your agreement covers. Nor would I turn a new enhancement into a fix because it seems small. The published commercial distinction remains: maintenance for bugs and a separate quote for new features.

Frequently asked questions

What behaviour was agreed upon?

I propose comparing your request against the deliverables and behaviour we set out in writing. Then I would distinguish what was observed from what you want changed. If the reference is incomplete, it should be clarified before classifying the intervention. I do not assume that every unexpected behaviour proves a bug, or that every request is an addition.

How do I quote an addition?

New features are quoted separately from maintenance. My published process defines deliverables, budget, and timeframe in writing before development. To prepare that proposal, I would ask you to describe the new operation and the outcome you want to review, separating them from any existing bug. I do not use the starting retainer as a flat fee for the addition.

PHP maintenance and evolution

PHP maintenance and evolution

Tell me about your case and I will review it in writing

Prepare your case with the checklist and self-assessment

Related articles

* Indicative starting prices, subject to conditions and change. VAT not included: charged separately at the applicable rate. The final amount is set in a written quote after reviewing your project and is binding only once accepted by both parties. Quotes are valid for 30 days. Full terms: General terms.